For the IRMM to obtain the necessary export approval, the end user must supply
an
end use undertaking. The end use undertaking must be:
-
An ORIGINAL document, not a copy
-
Be prepared on the end-users / consignee's headed notepaper,
-
Signed and dated by the end-user / consignee
-
Contain the appropriate wording
-
Include a description of the goods
-
Include the quantities to be exported
Facsimile or photocopies of the End-use Undertaking are not accepted. To avoid
delays please complete all the required sections, in English if possible.
“Nuclear explosive activity” includes research on or development, design,
manufacture, construction, testing or maintenance of any nuclear explosive
device or components or subsystems of such a device.
“Unsafeguarded nuclear fuel-cycle activity” includes research on or
development, design, manufacture, construction, operation or maintenance of
-
any reactor, critical facility, conversion plant or fabrication plant,
reprocessing plant, plant for the separation of isotopes of source or special
fissionable material, or separate storage installation, where there is an
obligation to accept International Atomic Energy Agency (IAEA) safeguards at
the relevant facility or installation, existing or future, when it contains
any source or special fissionable material which is not being met, or
-
any heavy water production plant, where there is an obligation to accept IAEA
safeguards on any nuclear material produced by or used in connection with any
heavy water production therefrom which is not being met and also includes any
such activity where there is no such obligation.